1. Protection of Biswanath-Panpur Dyke
Type of Scheme: Flood Management Program (FMP)
Name of the Project: Protection of Biswanath Panpur including upstream Silamari and far downstream Bhumuraguri to Boragaon against erosion of river Brahmaputra.
Estimated Amount: Rs. 167.09 crores.
B.C Ratio: 1.29:1
Benefited area: 33, 692 Hectors
S N |
Location |
Reach length |
|
Under Biswanath District- |
|||
1. |
At Silamari |
= |
800.00m |
2. |
At Baghacentre of Biswanath Panpur dyke |
= |
6,000.00m |
3. |
At Bhojmari |
= |
800.00m |
Under Sonitpur District - |
|||
4. |
At Bhomoraguri |
= |
1, 350.00m |
5. |
At Morabharali Iddgah |
= |
300.00m |
6. |
At Rabha Samadhi |
= |
600.00m |
7. |
At U/S of Circuit House |
= |
550.00m |
8. |
At Parbatia |
= |
300.00m |
9. |
At Teliagaon |
= |
1, 550.00m |
10. |
At Singri Sitalmari |
= |
2, 250.00m |
Total reach Length |
= |
14,500.00m |
Bank configuration before execution of work
After laying of silt filled Geo Bag
Laying of Geo Bags at apron
Dumping of Geo bags with barge
Laying of Geo mattress on river side slope
After completion of work
Launching of porcupine screen
During flood
Geo-bag revetment after flood
PSC Porcupine screen after flood
After flood