1. Protection of Biswanath-Panpur Dyke

Type of Scheme: Flood Management Program (FMP)

Name of the Project: Protection of Biswanath Panpur including upstream Silamari and far downstream Bhumuraguri to Boragaon against erosion of river Brahmaputra.

Estimated Amount: Rs. 167.09 crores.

B.C Ratio: 1.29:1

 Benefited area: 33, 692 Hectors

S N

Location

 

Reach length

Under Biswanath District-

   

1.

At Silamari

=

800.00m

2.

At Baghacentre of Biswanath Panpur dyke

=

6,000.00m

3.

At Bhojmari

=

800.00m

Under Sonitpur District -

   

4.

At Bhomoraguri

=

1, 350.00m

5.

At Morabharali Iddgah

=

300.00m

6.

At Rabha Samadhi

=

600.00m

7.

At U/S of Circuit House

=

550.00m

8.

At Parbatia

=

300.00m

9.

At Teliagaon

=

1, 550.00m

10.

At Singri Sitalmari

=

2, 250.00m

 

Total reach Length

=

14,500.00m

Bank configuration before execution of work

After laying of silt filled Geo Bag

Laying of Geo Bags at apron

Dumping of Geo bags with barge

Laying of Geo mattress on river side slope

After completion of work

Launching of porcupine screen

During flood

Geo-bag revetment after flood

PSC Porcupine screen after flood

After flood