Irrigation Department-Schemes

SCHEMES UNDER TEZPUR DIVISION

Current status of Irrigation Schemes under Tezpur Division (Irrigation),Tezpur

           Category

Total No.

Present status

Completed

On-Going

 Flow Irrigation Scheme (F.I.S.)

7

5

2

 Lift Irrigation Scheme (L.I.S.)

4

3

1

 Deep Tube Well Irrigation Scheme (D.T.W)

44

44

-

1. Flow Irrigation Scheme :-

a) Koloney F.I.S.

b) Monai F.I.S

c) Bengnanajuli F.I.S.

d) Dighaljuli F.I.S.

e) Dighalibeel F.I.S.

f) Dherai F.I.S.

g) Borsola F.I.S.

  

2. Lift Irrigation Scheme  :-

a) Depota L.I.S.

b) Belsiri L.I.S.

c) Dakhindol L.I.S.

d) Chataichapori L.I.S.

3. Deep Tube Well Irrigation Scheme :-

a) Morabharali D.T.W.

b) Dekargaon D.T.W. (2 points)

c) Bindukuri D.T.W     (2 points)

d) Bihaguri D.T.W. (2 points)

e) Neraiati Geruwa Pathar

f)  Ulubari Naharbari D.T.W.

g) Alisinga D.T.W.

h) Bhergaon D.T.W.

i)  Gowalparabasti D.T.W (2 points)

j)  Niz- Bihahaguri Bardubia D.T.W

          k) Borsola D.T.W. (30 points)

 

PROGRESS AT A GLANCE

1. Total No. of scheme                 = 24 Nos.

2. Total completed scheme        = 18 Nos.

3. Total on-going scheme          =   6 Nos.

a) Dighalibeel FIS & Dighalibeel (Accommodation)

b) Kolony FIS

c) Belsiri LIS

d) Kundarbari  MDTW I/S

e) Reconstruction Panbari FIS ( yet to start )

4. Partially functional scheme = 02 Nos. (Kolony FIS & Dighalibeel FIS)

5. On-going scheme progress 

a) 2 Nos. = Reconstruction Panbari FIS( yet to start ) & Kundarbari MDTW  Irrig. Scheme( under progress)

b) 50% but less than 90% = 2 No. (Kolony FIS & Belsiri LIS)

c) Minimum 90% = 1 No. (Dighalibeel FIS )